Buildings genset have a wide range of applications, such as office buildings, high-rise buildings, residential buildings, hotels, restaurants, shopping malls, post offices, schools, etc. They are usually used as backup power sources, and the main purpose is to make up for the power supply of the network insufficient. In the case of insufficient grid power supply, power shortages will be caused during peak hours, and the use of grid power will be restricted. The power supply department has to cut off power everywhere. At this time, peak-shaving power supplies are needed to help. In some backward islands, due to imperfect power grids and insufficient power supply, they are often used as common power sources..
SITUATION
- Used as standby power with automatic start.
- Ambient temperature is -15℃ to 40℃, altitude is less than 1000 meters.
- Genset installed in basement,environmental installation will be provided.
Powertec Solution
- ATS is provided in Powertec standard equipment working with ATS cabinet in distribution room to realize the function of automatic starting when city power is off.Ensure power supplying when nobody is on guard.For higher requirement building,Powertec provide 485 interfaces and communication protocol.It will be easy to monitor Genset working status in control room.
- According to practical working environment or working condition, configuration will be adjusted or external auxiliary equipment will be added. Such as a. Mounting water heater or oil heater b. Strengthen air intake to provide enough air for the Genset in the air intake-lacking room. C. As for the air intake critically insufficient room, remote water tank or outer loop cooling tower will be used.
- As for the Genset going to apply in base room, Powertec has much expericence in hosting and transporting and delivering to specified control room quickly and safely.
- According to the actual circumstance of generator room,comply to local law, Powertec offer the best buys environmental management plan of Genset to our customers and hand over the key to the customer when environmental protection project is completed and accepted.